Handrail Installation Steps

Release time2012.12.17   View16865

        

        Step1.Put line drilling: baluster mounting, has the following two kinds of mounting surface
        Section A.mounting on the completion of the decorative surface floor;Section B.mounting on the structured surface
        The "A" installation: according to the construction drawing graphic size on the mounting surface of Actinobacillus and drilling, to ensure that the installation of flat surface and hole center line parallel or vertical;
        The "B" installation: It should do good preembedded steel structural fashion, to facilitate the next installation work.Similarly, according to the construction drawing installation dimensions of Actinobacillus positioning, and clean the welding parts of the impurity.        
         Step 2. The baluster installation: the baluster in the drilled hole, by chemical or expansion bolt.As with embedded parts welding fixing mode, should choose the material and lower end of the same material flux.Install the baluster should ensure that the vertical and firm.The installation of other posts

                 

        Step 3. Install the glass railing: according to the construction plan on glass panel installation diagram, it sequentially installed glass plate in refuting fixed on the connecting piece, and the connecting screw injection glue and screwed to avoid loosening
        Step 4. Install handrail pipe(tube): the baluster top armrest pipe screw connection or welding mode and is fixed in the upright post support head.In order to installation convenience, we recommend: wood handrails for the sheetmetal screws, metal handrail tube bolts or argon arc welding method.
        Step 5: Finish Install and check to confirmation,ensure that the fixed glass: connecting screws, fixed column bolt is screwed.To ensure that the gasket mounting and support shims without leakage.
        Step 6: Clean up: with a wet towel swab paint glass, a handrail pipe, the column surface, remove dust, and other debris, and then dry towel wipe it again, to ensure that the product surface smooth, clean, no water and debris,etc.
 

          

        JINXIN HARDWARE is mainly working in many Special Items for different projects such as airport, metro/BTS, hotels, bridge, etc. If you have project or any questions, we will be happy to service to you.

Previous��Fashion shops use JINXIN's railing products

Next��Brand Times and furniture become a trend in the field of staircase

Handrail  |  Handrail Fittings  |  Frameless Series Products  |  Glass Spigot  |  Glass Canopy  |  Glass Spider  |  Steel Vase  |  Floor Drain  |  Sliding System  |  Hot Sales  |  Shower Room Hardware  |  Rail Bracket  |  Grab Bar  |  Handrail Support  |  Pipe Connector  |  Handrail Clamp  |  Base Plate  |  Door Handle  |  Handrail Pipe  |  Safety Glass  |  New Design  |  Custome Railing  |  Glass Canopy  |  Shower Room  |  Pipe/Tube  |  Frameless Railing  |  Slot fittings  |  Hot Sales  |  Glass Railing  |  Rod Railing  |  Cable Railing  |  Aluminum Railing  |  Flange & Cover  |  Bar Holder  |  Square Line  |  Sliding Door System  |  Sliding Door Fittings  |  Rod & Bar & Rope  |  Hot Sales  |  Stainless Steel Handle  |  Shower Handle  |  Screw & Tools  |  Glass Canopy Fittings  |  Glass Hinge  |  Glass Clamp/Clip  |  Other Hardware
Live Chat by comm100